Production Workflow
VORGEN Education · 02 · Intermediate / Build

Production Workflow

Machines do not fix a floor that is out of order.

The whole chain from enquiry to installed kitchen: measurement, job preparation, floor layout, part sorting, assembly, quality gates, delivery and the numbers that tell you where the real bottleneck is.

Watch
Understand
Apply
Grow
Who it is for
  • Owners and supervisors organising a workshop
  • Teams where parts go missing between stations
  • Anyone planning a move to a larger space
Before you start
  • Some production experience, at any scale
  • Useful to bring a real recent job to work through
What you will be able to do
  • Map your own order-to-delivery chain and find the bottleneck
  • Prepare and sequence jobs so the floor is never waiting
  • Lay out a workshop for flow rather than for storage
  • Put quality gates where they catch errors cheaply
  • Track lead time, output and rework with numbers you actually collect
Where it fits

This course belongs to 02 · Intermediate / Build of the VORGEN journey.

See the stage →
Syllabus

10 modules.

Draft course outline for confirmation. Module order and depth to be finalised with the training team.

01

Mapping order to delivery

  • Every step from enquiry to handover, written down
  • Where jobs wait, and why waiting is the real cost
  • Identifying the constraint instead of optimising everything
02

Site measurement and the design brief

  • A measurement checklist that prevents remakes
  • Services, tolerances and out-of-square walls
  • Recording customer decisions so they are not disputed later
  • The approval step before anything is cut
03

Job preparation

  • Checking a production file before releasing it
  • Batching across jobs, and when batching hurts delivery
  • Staging material and hardware before the job starts
04

Floor layout and flow

  • Laying out for material flow, not for equipment convenience
  • Work in progress: how much is healthy
  • Handling and trolleys
  • Space for offcuts, finished parts and packing
05

Part identification and sorting

  • Labelling that survives the whole process
  • Sorting by cabinet, not by part type
  • Trolley and staging systems
  • Finding a missing part without stopping the floor
06

Assembly

  • Assembly sequence and jigs
  • Pre-drilling and hardware fitting
  • Squaring and checking a carcass
  • Protecting finished faces during assembly
07

Quality gates

  • Inspecting after cutting, after banding and before packing
  • Written acceptance criteria the team agrees on
  • The rework loop: recording it, not hiding it
  • Stopping a batch when something is systematically wrong
08

Packing, protection and delivery

  • Protecting edges, faces and hardware in transit
  • Loading order matched to installation order
  • Delivery documentation and counting out
09

Installation and handover

  • Installation checklist and manpower planning
  • Site protection and making good
  • Handover, snagging and defect response
10

Measuring the floor

  • Lead time, output per day and on-time delivery
  • Rework rate and material yield
  • Collecting numbers without adding paperwork nobody completes
  • Using the numbers to decide the next investment